Simple explanation of the installation machine operation process
Checking before the installation machine:
Check whether the surface of the box is cleaned, check whether the voltage of the box is normal, check whether the components such as screws are loose. Enter the next step after checking.
2. Preparation of materials and boxes:
The instructions of the box and product (document vouchers) are stacked neatly and placed on the correct fabric rack, and the material is ensured that the material is passed in the correct direction.
3. The switch operation process of the installed machine:
Press the switch button of the loader to adjust to the right installation speed. The installation machine will put the material into the box in an orderly manner and do the closed box and packaging.
When we need to stop the installation machine, press the stop button of the installation machine. After the machine stops completely, disconnects the power, clean the residual box and the materials on the conveyor belt.
KXZ-100A automatic small box box machine
During the operation of the installed machine, you cannot clean any parts of the component of the installation machine. Please clean up the vertical installation machine according to the following process.
1. Take the remaining packaged materials from the machine, clean the inside and outside of the machine with the inner and outer debris and garbage of the machine. It is difficult to use low -pressure compressed air to use low -pressure compression air to blow debris and garbage to collect it; Clean; you can use a wiping or sponge with wine to wipe the carton to walk the mechanical parts. Note that the electrical element does not allow liquid to wipe it to avoid damage. Before restoring production, all machine components cleaned with liquid must be completely dry.
2. Clean all the photoelectric switches with Rouran's dry cloth.
3. When cleaning the suction cup, you can carefully spray 50%of isopropanol and aquatic solution on the surface of the suction cup, and then wipe the suction cup surface with a clean cloth.
4. When the paper box is formed in the machine, it can be sprayed with non -toxic stainless steel cleaner, and then dry it with a clean cloth. Note that before cleaning, you must ensure that the bolts are tightly installed in each guide. Shift.
5. Clean protective cover: Spray anti -static cleaners on all protective masks, and then dry the protective cover with a clean cloth.
6. For the shaft roller that must be cleaned in order to clean, it is only cleaned from the output side to the operator, or the protective cover is used above the input end and the roller gap.